Employer: GBT Sp. z o.o. in Gdańsku

Period:  2013

Job: “Construction of the Gdańsk Bulk Terminal”.

 

  • Preparation of shop drawings for the Weighing Tower, ES1 Bridge, ES2 Bridge and ES3 Bridge
  • Fabrication of hot-dip galvanised steel structure of the weighing tower including the installation of box profile sheets on the walls and roof, sealing of temporary construction openings and installation of air grilles and doors
  • Fabrication and erection of the hot-dip galvanised steel structure of the ES1 bridge, including the installation of box profile sheets on the walls and roof
  • Fabrication and erection of the hot-dip galvanised steel structure of the ES2 bridge and ES3 bridge, steel railings and ladders